What is a Building and/or Development Permit Required for?
What is a Building and/or Development Permit NOT Required for?
What should you bring when obtaining a permit?
During what stages of construction are inspections required?
What are the permit fees?
What are the drawing requirements for new buildings/additions?
Who do I contact for subdivision information?
What is a Building and/or Development Permit Required for?
New building construction
Structural change
Building demolition
Building relocation
Change of use
All sheds, garages, and accessory structures
Decks and stairs
Roof enclosure over an existing or new deck
Alterations/Renovations valued over $5,000
Note: Any work not included in the approved Building Permit such as decks or finished basements will require a separate permit.
What is a Building and/or Development Permit NOT Required for?
Fences
Cosmetic repairs such as painting
Change of occupant with same use
Replacing doors and windows in existing openings; unless the structure is altered
Replacing roofing; unless the structure is altered
Non-structural work value less than $5000
Note: It is the responsibility of the owner to obtain required permits prior to starting construction.
What should you bring when obtaining a permit?
Complete set of building plans/construction drawings
Value of construction
Permit fee
Names of the contractors, general contractors, licensed plumber, licensed electrician, mason, etc
Site plan with dimensions from building(s) to property lines
Note: It is the responsibility of the owner and the contractor to ensure all work carried out is in accordance with the Building Code and the Land use By-Law even if a permit is not required
During what stages of construction are inspections required?
Sewer connections before filling in trench
Footings before pouring foundation walls.
Before backfilling foundation.
Framing, roof tight, rough plumbing, and mechanical
Insulation/Vapour Barrier before covering interior walls and ceilings.
Final Inspection prior to any use or occupancy of a building.
Note: An occupancy permit is required prior to occupancy of the building.
What are the permit fees?
Residential, Community Centers and Churches (Construction excluding unfinished basements): $5.00 plus $0.06/sq. ft.
Sheds, Garages, barns and farm buildings: $5.00 plus $0.02/sq. ft.
Other non residential uses, such as Commercial and Industrial Buildings: $5.00 plus $0.10/sq. ft.
Alterations and Repairs: $5.00 plus $1.00 per $1000
Demolition Permit: $0.00
Development Permit: $0.00
What are the drawing requirements for new buildings/additions?
One complete set of construction drawings is required. These drawings must be drawn to scale and should include the following:
Site Plan
Showing property and building dimensions and distances to property lines.
Structural Drawings
Showing foundation plan (type, size & dimensions), floor plans, columns, bearing walls, stairs, ramps, roof plan and structural details.
Building Elevations
Showing exterior finishes (all views), finished grade level, windows, doors , chimneys, stairs, etc.
Floor Plans
Showing all room dimensions, wall types, window and door schedules and room finish schedules.
Sections
Showing building and wall sections (all construction materials), grade level, floor heights, and stair sections.
Who do I contact for subdivision information?
If you are subdividing lands in the Municipality of Argyle or have inquiries regarding subdividing lands in the municipality please contact Property Inspection & Public Works Department at (902) 648-2623.
You can view the Provincial Subdivision Regulations through this link:
http://www.gov.ns.ca/just/regulations/regs/mgsubdiv.htm
|